Mideast 100GWh Storage Era – Chasun Full Supply for EPC

Middle East‘s 100GWh Solar-Storage Era Begins – JA Solar 3GW, BYD 11.275GWh Lock in RTC Mega Project

In July 2026, the UAE RTC (Round The Clock) solar-storage project entered its equipment delivery phase. This is the world‘s first GW-scale 24/7 renewable energy project, featuring a 5.2GW solar PV plant paired with a 19GWh battery energy storage system. With a total investment of $6.1 billion, the project is jointly developed by Masdar and EWEC and is scheduled for full operation in 2027.

Multiple Chinese companies have secured core shares of the project:

JA Solar The first 3GW of modules were shipped to Abu Dhabi in July, securing its position as the project‘s largest PV supplier. JA Solar was named the preferred supplier by Masdar in 2025.
BYD Energy Secured an 11.275GWh storage order, supplying an independent storage power station within the project – one of the largest single storage procurement contracts in history.
Sungrow Previously signed a contract for 7.5GWh of PowerTitan 3.0 liquid-cooled storage systems and 2.6GW of inverters.
JinkoSolar Previously signed a 2GW Tiger Neo 3.0 module supply agreement.
CATL Previously named as the preferred BESS supplier for the project.

Notably, JinkoSolar‘s Tiger Neo 3.0 modules surpassed 20GW in global orders in the first half of 2026, with approximately 60% coming from distributed markets worldwide. The Tiger Neo 3.0 has become the preferred choice in distribution markets due to its superior low-light response and shading resistance.

The Middle East solar-storage market has entered the “100GWh-scale procurement” era – with the RTC project‘s 19GWh storage entering delivery, solar-storage integration has moved from blueprint to reality. For EPCs, single-source supply and reliable lead times for modules, inverters and batteries have become mandatory qualifications for participating in subsequent national projects such as NEOM.

Chasun Solar‘s One-Stop Full Supply

As a core JinkoSolar partner, Chasun Solar offers full-series supply of Tiger Neo 3.0 modules, along with Deye/Solax inverters and own-brand Hengguan batteries – delivering one-stop module + inverter + battery supply for EPCs:

Modules Jinko Tiger Neo 3.0 N-type TOPCon, 625W-720W, 24.5%+ efficiency, 85±5% bifaciality, -0.26%/°C, <1% first-year degradation. Surpassed 20GW in global orders in H1 2026, with 60% from distributed markets – adaptable to diverse Middle East project requirements.
Inverters Authorized Deye and Solax distributor – 3kW-80kW hybrid inverters with on/off-grid switching, diesel input, 6 TOU, IP65 – built for the Middle East‘s heat and grid conditions.
Batteries Own-brand Hengguan LiFePO₄ – 5/10/16kWh modular, 6,000 cycles, smart BMS, expandable to MWh.

Core Advantages

Single-source supply – modules, inverters, batteries from one supplier – no compatibility risks or finger-pointing
Factory-direct pricing – just 60-70% of marked-up brand chains
Free system design & LCOE calculation

The Middle East‘s 100GWh solar-storage era is fully underway. JA Solar‘s 3GW, BYD‘s 11.275GWh, and Sungrow’s 7.5GWh have locked in their shares, but national projects like NEOM and the Red Sea tourism zone are coming up for tender. Chasun Solar‘s complete product matrix and full-service capability help you secure your share of the next round of solar-storage tenders.

Middle East EPCs and developers – contact us for your full-supply solution!


Post time: Jul-23-2026